{"id":2260,"date":"2024-10-22T05:38:36","date_gmt":"2024-10-22T05:38:36","guid":{"rendered":"https:\/\/www.luxuryresidences.in\/blog\/?p=2260"},"modified":"2026-06-06T12:33:55","modified_gmt":"2026-06-06T12:33:55","slug":"mumbai-metro-route-map-and-station-list","status":"publish","type":"post","link":"https:\/\/www.luxuryresidences.in\/blog\/mumbai-metro-route-map-and-station-list","title":{"rendered":"Mumbai Metro Route 2026- A Complete Guide for Travellers"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"2260\" class=\"elementor elementor-2260\" data-elementor-settings=\"{&quot;ha_cmc_init_switcher&quot;:&quot;no&quot;}\">\n\t\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-66c347f2 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"66c347f2\" data-element_type=\"section\" data-e-type=\"section\" data-settings=\"{&quot;_ha_eqh_enable&quot;:false}\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-77a020e6\" data-id=\"77a020e6\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-a827882 elementor-toc--minimized-on-tablet elementor-widget elementor-widget-table-of-contents\" data-id=\"a827882\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;exclude_headings_by_selector&quot;:[],&quot;headings_by_tags&quot;:[&quot;h2&quot;,&quot;h3&quot;,&quot;h4&quot;,&quot;h5&quot;,&quot;h6&quot;],&quot;marker_view&quot;:&quot;numbers&quot;,&quot;minimize_box&quot;:&quot;yes&quot;,&quot;minimized_on&quot;:&quot;tablet&quot;,&quot;hierarchical_view&quot;:&quot;yes&quot;,&quot;min_height&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:[]},&quot;min_height_tablet&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:[]},&quot;min_height_mobile&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:[]}}\" data-widget_type=\"table-of-contents.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-toc__header\">\n\t\t\t<h2 class=\"elementor-toc__header-title\">\n\t\t\t\tTable of Contents\t\t\t<\/h2>\n\t\t\t\t\t\t\t<div class=\"elementor-toc__toggle-button elementor-toc__toggle-button--expand\"><svg class=\"e-font-icon-svg e-fas-chevron-down\" viewBox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/div>\n\t\t\t\t<div class=\"elementor-toc__toggle-button elementor-toc__toggle-button--collapse\"><svg class=\"e-font-icon-svg e-fas-chevron-up\" viewBox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/div>\n\t\t\t\t\t<\/div>\n\t\t<div class=\"elementor-toc__body\">\n\t\t\t<div class=\"elementor-toc__spinner-container\">\n\t\t\t\t<svg class=\"elementor-toc__spinner eicon-animation-spin e-font-icon-svg e-eicon-loading\" aria-hidden=\"true\" viewBox=\"0 0 1000 1000\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M500 975V858C696 858 858 696 858 500S696 142 500 142 142 304 142 500H25C25 237 238 25 500 25S975 237 975 500 763 975 500 975Z\"><\/path><\/svg>\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-4e304b0 elementor-widget elementor-widget-text-editor\" data-id=\"4e304b0\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<p><b>Mumbai Metro route\u00a0<\/b>2026, the financial capital of India, is rapidly changing its face with back-to-back infrastructure development. Moreover, the influx of people in the city is further pushing the infrastructure ahead. According to one report, the city&#8217;s population is set to reach around 28 million by 2030. So, imagine the transportation requirement to manage this increasing population.\u00a0<\/p><p>In 2004, the\u00a0Mumbai Metropolitan Region Development Authority\u00a0(MMRDA) unveiled a plan to offer citizens easy and fast rapid transit services. Mumbai Metro is the biggest and most successful transit service currently in Mumbai.<\/p><p>Started with the Mumbai Metro Line between Ghatkopar-Versova, at present multiple lines will go to Metro Line 10 in the coming future. Recently, Mumbai Metro Line 3 (Underground Metro) the 33.5 km still under construction, started its operation from BKC to Aarey Colony, covering Marol Naka. It is called the Aqua Line, and recently the total ridership went on to over 2,00,000, and Marol Naka is the peak spot.<\/p><p>The Maharashtra government implemented this mass rapid transit service Mumbai Metro in 2006, and has been highly successful among riders. Metro 2A and Metro Line 7 are some routes nearing completion. The rest of the lines are in various stages of construction.<\/p><p>This article will give you complete insight into\u00a0<b>Mumbai Metro route\u00a0<\/b>2026 and other upcoming metro lines for your guidance.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-baa2be4 elementor-widget elementor-widget-heading\" data-id=\"baa2be4\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Mumbai Metro Operational Lines<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-4eff63a elementor-widget elementor-widget-text-editor\" data-id=\"4eff63a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<p>Since most of the metro lines are in different stages of construction. We have listed both the completed one and the under construction for better understanding.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a88114d elementor-widget elementor-widget-heading\" data-id=\"a88114d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h4 class=\"elementor-heading-title elementor-size-default\">Mumbai Metro Line 1 Route- Versova- Andheri- Ghatkopar<\/h4>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-8f86b82 elementor-widget elementor-widget-image\" data-id=\"8f86b82\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img fetchpriority=\"high\" decoding=\"async\" width=\"720\" height=\"736\" src=\"https:\/\/www.luxuryresidences.in\/blog\/wp-content\/uploads\/2025\/01\/Mumbai-Metro-Route-Map.webp\" class=\"attachment-large size-large wp-image-2934\" alt=\"Mumbai Metro Route Map\" srcset=\"https:\/\/www.luxuryresidences.in\/blog\/wp-content\/uploads\/2025\/01\/Mumbai-Metro-Route-Map.webp 720w, https:\/\/www.luxuryresidences.in\/blog\/wp-content\/uploads\/2025\/01\/Mumbai-Metro-Route-Map-293x300.webp 293w\" sizes=\"(max-width: 720px) 100vw, 720px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2f56753a elementor-widget elementor-widget-text-editor\" data-id=\"2f56753a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"background-color: var(--bs-body-bg);\">The Mumbai Metro Line 1 operated between Versova-Andheri-Ghatkopar is the very first project under the mass rapid transit project. Initially, the speed was 65kmph which was increased to 80kmph with 18 additional daily trips. Since this route is highly commercially operated, there are daily more than 1lakh commuters using this transit.<\/span><\/p><p>Reliance Infrastructure holds 69% of the stake and is the first blue line in the financial city. The metro line covers 11.4 km and has 12 stations. This line aims to reduce the traffic congestion of the locality between Ghatkopar and Andheri.<\/p><h4><span style=\"font-weight: bold; color: inherit; font-family: inherit; font-size: 1.75rem; background-color: var(--bs-body-bg); text-align: var(--bs-body-text-align);\">Mumbai Metro Route 2 (2A-2B) Yellow Line- Dahisar to Mandale<\/span><\/h4><p>The second project under Mumbai Metro route line 2 runs between Dahisar to Mandale. There are two different operations- 2A and 2B (Under Construction). It was inaugurated in August 2009 by then-President Pratibha Patil. The total length covered is 42 km with 37 stations (2A- 17, 2B 20) coming under it.<\/p><p>The 2A Line runs between Dahisar (east) and DN Nagar. Line 2 runs from ESIC Nagar to Mandale.<\/p><p>Line 2A is an elevated metro network and both these lines are built with the cost Rs 17,000 crores under multiple phases. Since its operation, the traffic has been reduced on the WEH and link road.<\/p><h4><span style=\"font-weight: bold;\">Metro Line 3- Underground Metro Aqua Line- Colaba- Bandra- SEEPZ Line<\/span><\/h4><p>The 33 km Metro Line Route 2026 called the Aqua Line is an underground metro running from Navy Nagar (south) to Aarey Depot. It will include existing and upcoming metro lines along with the Mumbai International Airport. Built with a budget of more than Rs 30,000 crore, five major groups are funding the project: MMRCL, Padeco, MMRDA, CREC, and JICA.<\/p><p>A total of 27 stations are covered between Cuffe Parade to Aarey Colony. The operation of Phase 1 of line 3 began in October 2024 and the footfall has increased 5% more than expected. The Aqua Line is expected to be complete by May 2025. All the stations are underground 10-14 metres below the ground level.<\/p><h4 style=\"font-family: Poppins, sans-serif; color: #000000;\"><span style=\"font-weight: bold;\">Metro Line 4 Route-\u00a0 Wadala (Mumbai) to Kasarvadavali (Ghodbunder road, Thane)<\/span><\/h4><p>The Green line stretching over 35k\u00a0 will operate between\u00a0 Wadala (Mumbai) to Kasarvadavali (Ghodbunder road, Thane). It is an elevated double-track viaduct (U-girders) and includes a total of 30 stations. As an extension of the current general consulting contract, the project was given to a group consisting of Louis Berger, Hill International, and DB Engineering &amp; Consulting.<\/p><p>In addition to rail systems including tracks, signaling, telecommunications, power supply, automated fare collection, and overhead contact line systems, the project also includes civil infrastructure elements such as elevated viaducts, stations, depots, and stations with associated workshops. The overall cost of the project is Rs 64,000 crore.<\/p><h4><b style=\"color: inherit; font-family: inherit; font-size: 1.75rem; background-color: var(--bs-body-bg); text-align: var(--bs-body-text-align);\">Mumbai Metro Route Line 5- Thane with Kalyan via Bhiwandi<\/b><\/h4><p><span style=\"font-weight: 400;\">The upcoming Mumbai Metro route, which is an orange line 4 will cover 24.9km\u00a0 connecting Thane with Kalyan via Bhiwandi. The total cost for this project is around Rs 7500 crore and is under construction. On December 18, 2018, Prime Minister Narendra Modi laid the cornerstone for Kalyan&#8217;s Line 5.[8][9] The MMRDA announced in June 2019 that it had decided to begin Line 5 at Kapurbawdi station, which would act as an interchange with Line 4. The initial idea was to construct a distinct station 500 meters from Line 4 stop.<\/span><\/p><p><span style=\"font-weight: 400;\">There were two stages to the 24.9-kilometer line&#8217;s construction. The first phase consists of an 11.68 km stretch that connects Dhamankar Naka in Bhiwandi with Kapurbawadi in Thane. Between Bhiwandi and Kalyan, the second phase spans 11.8 km, including a 3 km subterranean segment between Dhamankar Naka and Temghar.<\/span><\/p><h4><b>Mumbai Metro Route Line 6- Vikhroli (E) to Jogeshwari, WEH, Powai<\/b><\/h4><p><span style=\"font-weight: 400;\">The Pink Line 6 Mumbai Metro will connect the Lokhandwala Complex with Vikhroli and will have 13 stations. This under-construction 14.5 km route will pass through Powai connecting to Vikhroli EEH starting from Lokhandwala. It provides interchange capabilities at various sites, including Gandhi Nagar for Line-4, Aarey Depot station for Line-3, JVLR station for Line-7, and Adarsh Nagar for Line-2A.<\/span><\/p><p><span style=\"font-weight: 400;\">Like other Metro lines, it features an integrated ticketing system, escalators, lifts, and stairwells, as well as better walkways with ramps for the elderly and those with disabilities. The Rs 6,000 crore Mumbai metro Line 6 project will operate from 2025.<\/span><\/p><h4><b>Mumbai Metro Line 7 (Andheri East- Dahisar East)<\/b><\/h4><p><span style=\"font-weight: 400;\">The 33 km red line 7 of Mumbai Metro will run between Andheri (e) and Dahisar (e) passing through Mumbai International airport.\u00a0 It will connect the current Metro Line 2A (Dahisar to D N Nagar), Metro Line 1 (Ghatkopar to Versova), Metro Line 6 (Swami Samarth Nagar to Vikhroli), and the Western Express Highway.<\/span><\/p><p><span style=\"font-weight: 400;\">Two sections of the line were launched on April 2, 2022, from Dahisar East to Aarey, and on January 19, 2023, from Aarey to Gundavli in Andheri (East). Red Line 9 includes an 11.386 km segment of Line 7 from Bhayander to Dahisar that is currently under construction. Additionally, a southerly extension of the airport is also being built. The cost of the project is around Rs 6518 crore.<\/span><\/p><h4><b style=\"color: inherit; font-family: inherit; font-size: 1.75rem; background-color: var(--bs-body-bg); text-align: var(--bs-body-text-align);\">Mumbai Metro 8- Gold Line<\/b><\/h4><p><span style=\"font-weight: 400;\">The Mumbai Metro&#8217;s Gold Line 8 is an airport express line that serves Mumbai and Navi Mumbai. It would provide direct service between Mumbai&#8217;s CSMIA Airport and Navi Mumbai&#8217;s NMIA Airport. The route would be entirely elevated at 35 km (21.74 mi). On this line, eight metro stations with a 15-minute frequency have been proposed.<\/span><\/p><h4><b>Mumbai Metro Line 9<\/b><\/h4><p><span style=\"font-weight: 400;\">Mumbai Metro Line 9 is an extension to Metro Line 7 from Andheri to CSIA and Dahisar to Mira Bhayander and is 13.581 km long (11.386 km elevated and 2.195km underground) with 10 stations. The fact that this line will cross a double-decker bridge will set it apart from the other metro lines. The metro will operate on the second deck, while a flyover will be located on the first level.\u00a0<\/span><\/p><p><span style=\"font-weight: 400;\">Close to the projected Shivaji Chowk (Mira Road) metro station, the flyover will travel via Mira Bhayander Road to Bhayander (West). The Western Line, the Mumbai Metro (Lines 2 and 7), and the Western Express Highway will all be connected by it.<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ce87a4e elementor-widget elementor-widget-heading\" data-id=\"ce87a4e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Deadlines for New and Existing Mumbai Metro&nbsp; Route Lines<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-90facb4 elementor-widget elementor-widget-text-editor\" data-id=\"90facb4\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<ol><li aria-level=\"1\">Several\u00a0Mumbai Metro route\u00a0lines are presently under construction, with phase 1 of the line began its operation in October 2024.<\/li><li aria-level=\"1\">With an anticipated completion date of June 2025, 60% of the elevated Metro Line 2B project has already been finished.<\/li><li aria-level=\"1\">By mid-2025, Metro Lines 4 and 4A should be finished, covering 35.2 kilometres.<\/li><li aria-level=\"1\">Metro Line 5&#8217;s first phase is almost finished, with a December 2025 completion date.<\/li><li aria-level=\"1\">With an anticipated completion date of December 2024, Metro Line 6 has achieved 73.25% progress towards the completion of the civil construction overall.<\/li><\/ol>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-8d9ee33 elementor-widget elementor-widget-heading\" data-id=\"8d9ee33\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Total Ridership in Mumbai Metro Route<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-0d3530e elementor-widget elementor-widget-image\" data-id=\"0d3530e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"564\" height=\"576\" src=\"https:\/\/www.luxuryresidences.in\/blog\/wp-content\/uploads\/2024\/10\/Mumbai-Metro-Map.webp\" class=\"attachment-large size-large wp-image-2941\" alt=\"Mumbai Metro Map\" srcset=\"https:\/\/www.luxuryresidences.in\/blog\/wp-content\/uploads\/2024\/10\/Mumbai-Metro-Map.webp 564w, https:\/\/www.luxuryresidences.in\/blog\/wp-content\/uploads\/2024\/10\/Mumbai-Metro-Map-294x300.webp 294w\" sizes=\"(max-width: 564px) 100vw, 564px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b175384 elementor-widget elementor-widget-text-editor\" data-id=\"b175384\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<p style=\"text-align: justify;\">Since the\u00a0<a href=\"https:\/\/www.luxuryresidences.in\/blog\/mumbai-metro-route-map-and-station-list\"><b>Mumbai metro route<\/b><\/a>\u00a0covers the maximum part of the city, the ridership is increasing daily. As of July 2024, the daily ridership was around 7lac which is set to grow in the coming months.<\/p><h2 style=\"text-align: justify;\">Summing it up<\/h2><p style=\"text-align: justify;\">The Mumbai Metro is changing the phase of overall mass transit in this overly congested city. To relieve people and the city from traffic congestion, Mumbai Metro route is the best infrastructure investment done by MMRDA and the Government of India.<\/p><p><strong>Read on To Know More<\/strong><\/p><table><tbody><tr><td width=\"301\"><p><strong>Apartments For Sale in Mumbai<\/strong><\/p><\/td><td width=\"301\"><p><strong><a href=\"https:\/\/www.luxuryresidences.in\/mumbai\/luxury-apartments-in-mumbai\">Luxury Apartments in Mumbai<\/a><\/strong><\/p><\/td><\/tr><tr><td width=\"301\"><p><strong>Flats For Sale in Mumbai<\/strong><\/p><\/td><td width=\"301\"><p><strong><a href=\"https:\/\/www.luxuryresidences.in\/mumbai\/luxury-flats-in-mumbai\">Luxury Flats in Mumbai<\/a><\/strong><\/p><\/td><\/tr><tr><td width=\"301\"><p><strong>Penthouses For Sale in Mumbai<\/strong><\/p><\/td><td width=\"301\"><p><strong><a href=\"https:\/\/www.luxuryresidences.in\/mumbai\/luxury-penthouses-in-mumbai\">Luxury Penthouses in Mumbai<\/a><\/strong><\/p><\/td><\/tr><tr><td width=\"301\"><p><strong>Projects For Sale in Mumbai<\/strong><\/p><\/td><td width=\"301\"><p><strong><a href=\"https:\/\/www.luxuryresidences.in\/mumbai\/luxury-projects-in-mumbai\">Luxury Projects in Mumbai<\/a><\/strong><\/p><\/td><\/tr><tr><td width=\"301\"><p><strong>Properties For Sale in Mumbai<\/strong><\/p><\/td><td width=\"301\"><p><strong><a href=\"https:\/\/www.luxuryresidences.in\/mumbai\/luxury-properties-in-mumbai\">Luxury Properties in Mumbai<\/a><\/strong><\/p><\/td><\/tr><\/tbody><\/table><p style=\"text-align: justify;\">\u00a0<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Table of Contents Mumbai Metro route\u00a02026, the financial capital of India, is rapidly changing its face with back-to-back infrastructure development&#8230;.<\/p>\n","protected":false},"author":4,"featured_media":4771,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_crdt_document":"","footnotes":""},"categories":[291],"tags":[],"class_list":["post-2260","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mumbai"],"_links":{"self":[{"href":"https:\/\/www.luxuryresidences.in\/blog\/wp-json\/wp\/v2\/posts\/2260","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.luxuryresidences.in\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.luxuryresidences.in\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.luxuryresidences.in\/blog\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.luxuryresidences.in\/blog\/wp-json\/wp\/v2\/comments?post=2260"}],"version-history":[{"count":74,"href":"https:\/\/www.luxuryresidences.in\/blog\/wp-json\/wp\/v2\/posts\/2260\/revisions"}],"predecessor-version":[{"id":4779,"href":"https:\/\/www.luxuryresidences.in\/blog\/wp-json\/wp\/v2\/posts\/2260\/revisions\/4779"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.luxuryresidences.in\/blog\/wp-json\/wp\/v2\/media\/4771"}],"wp:attachment":[{"href":"https:\/\/www.luxuryresidences.in\/blog\/wp-json\/wp\/v2\/media?parent=2260"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.luxuryresidences.in\/blog\/wp-json\/wp\/v2\/categories?post=2260"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.luxuryresidences.in\/blog\/wp-json\/wp\/v2\/tags?post=2260"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}